Duration depends on the size of the site, the ground conditions, the amount of excavation and formwork, the reinforcement required and the weather during placement. A small slab and a deep substructure are very different jobs. For that reason, be wary of any firm timescale offered before someone has seen the site and the drawings. Ask what the estimate assumes about ground and weather.